WQ 1000: All 25 Parts
Part 1: Applicability, Purpose, Waivers, Statutory Definitions
Part 2: Definitions
Part 3: Applications for Subdivision or ISDS
Part 4: Approvals, Replacement of ISDS Components, Installation, Expansions
Part 5: Subdivisions
Part 6: Test Pits
Part 7: Percolation Tests
Part 8: Design Requirements for All Systems
Part 9: Sewer Lines
Part 10: Septic Tanks
Part 11: Aeration Tanks
Part 12: Grease Interceptors and Floor Drains
Part 13: Sewage Pumps and Siphons
Part 14: EDA's Soils and Setbacks
Part 15: Distribution Boxes
Part 16: Construction Requirements for All Systems
Part 17: Effluent Conduits
Part 18: Trenches and Beds
Part 19: Pressure Distribution
Part 20: Dry Wells
Part 21: Raised Effluent Disposal Areas
Part 22: Alternate Systems
Part 23: Operation Requirements
Part 24: Innovative Technology
Part 25: Waterfronts